PHYSICS & ASTRONOMY DEPARTMENT



Groundbreaking     |    Pre-construction     |    Excavation and Demolition    |    Construction    |    Post Construction
 
 


SCIENCE CENTER

Gallery 1


The following pictures, taken at different times, show the conditions of the two Physics Department's labs; STEW 178 and STEW 179; before and after the demolition work began.
STEW 178
(10/26/01)                

(11/14/01)

STEW 179
(10/26/01)

(11/08/01)




The pictures below, also taken at different times, show the corridor which presently houses the faculty offices, a few labs and lecture halls.
The ceiling panels have been removed for alterations to the ventilation overlay of the Physics and Astronomy Dept.
(10/26/01)
(10/26/01)




The following pictures show some of the demolition work that occured inside the building to make room for the extension process. The room, originally, was the storeroom for the Department. The construction site is observable through the hole in the wall.
(11/08/01)
(11/09/01)



The pictures shows the Science Library (atleast that is what it used to be). The Science Library has been shifted to the third floor of Beeghly Library for the duration of the extension process.
(10/26/01)
(11/05/01)


The picture shows the corridor leading towards the Physics Lab (STEW 179). The corridor and the lab, now no longer exist. The whole area was torn down for the extension process.
(11/08/01)







Home     |     OWU     |    Physics Dept.     |    Dept. Maps     |    Credits

Department of Physics and Astronomy , Ohio Wesleyan University . Delaware, OH    43015