These pictures were taken in the beginning of the month of February.

The initial construction has started. The ground has been leveled and the steel structure is starting to take shape.








The following pictures were taken on 02/25/02.

The picture taken after almost a week of the last photos shows the steel structure to be in place. Most of the second floor structure has been laid down. The construction of the third floor structure has been undertaken.








The following pictures were taken on 02/27/02 .

These pictures taken after 2 days show the second floor steel framework to be in place. The steel floorings for the the floors are about to be spread out.




The following  pictures were taken on   03/04/02.

These pictures taken a week later show most of the second floor's floorings to be in place and some work to have started on the ground level













The following pictures were taken over a time period spreading over the mid-month of March.

By this time most of the structural framework has been completed with the roof structure also in place. Work on the first floor has started with the digging process for installations of pipes.










The following pictures were taken on 06/04/02.

You can get a overview of the progress to this point, both inside and outside. The greenhouse is complete and operational.





The following pictures were taken on 08/14/02.

The skeleton structure of the extension project is amost complete with the laying of the stones on the outer wall also coming to an end.
By this time, the East wall of Stewart has been fixed with new windows.